3 down – 1 to go (for this round)

By on Jul 28, 2014 in First Floor, Renovation, Second Floor | 0 comments

Share On GoogleShare On FacebookShare On Twitter

We’re baaaaaaack!

 

Italy Summer 2014

Grieve in Chianti, Tuscany Italy

(is it bad that I want to go rigth back on vacation?!)

537 on 7.23

The house has been progressing along.

side 7.27

painting exterior

The exterior has received its first coat of paint.

side porch front 7.27

It finally looks like it’s a whole home now.

lounge to kitchen1 7.27

We have successfully completed the plumbing, electrical and framing inspections.

3rd level BR

Insulation went in on Friday/Saturday.

3rd level BR 7.27

The insulation inspection is this Tuesday and is the last of this round of inspections. Then the drywall starts.

doors 7.27

And, our nifty new doors have been installed in the lounge.   Check out the video here.    I’m really loving this feature!