Google PlusFacebookTwitter

A video tour of the finished product

By on Dec 16, 2014 in Addison's Bedroom, Back Porch, Bonus Room, Cellar, Deck and Patio, Dining Room, First Floor, Foyer, Front Porch, Guest Bathroom, Guest Bedroom, Kitchen, Living Room, Lounge, Master Bathroom, Master Bedroom, Master Closet - Hers, Master Closet - His, Music Room, Office - Hers, Office - His, Renovation, Second Floor, Third Floor, Upstairs Landing, Wine Cellar | 0 comments

WE DID IT!

By on Dec 7, 2014 in Addison's Bedroom, Back Porch, Bonus Room, Cellar, Deck and Patio, Dining Room, First Floor, Front Porch, Guest Bathroom, Guest Bathroom, Guest Bedroom, Kitchen, Landscaping, Living Room, Lounge, Master Bathroom, Master Bedroom, Master Closet - Hers, Music Room, Office - Hers, Office - His, Renovation, Second Floor, Upstairs Landing, Wine Cellar | 0 comments

Well – we did it! What a long and grueling four weeks this has been. It’s been especially grueling with my back. As some of you may know, I have been struggling with major back issues for the last couple of years. These last few weeks have practically broken me –  and I’m seriously ready for some R&R.  2015 will be the year that I will finally rid myself of this problem – whether it be holistically or surgically. But despite this bad back and fighting a cold – we did it – with a lot of help from our friends! We pushed our builder, Ryan, to get us in on time – and he delivered! We all knew we were a little premature getting in, and those first two weeks were pure chaos – with almost 20 people a day working at our home. For those of you that have lived through a renovation – I salute you. I could not imagine living for...

It takes a village

By on Nov 26, 2014 in Back Porch, Cellar, Dining Room, First Floor, Foyer, Kitchen, Linen Closet, Living Room, Lounge, Music Room, Pantry, Renovation, Wine Cellar | 4 comments

It has been  LONG and EXHAUSTING couple of weeks. But we are in and almost unpacked. While the movers were busy unloading, Scott and his crew were busy making sure that we’d have beautiful rooms before the first week was over. They succeeded! We love our new artwork from Jenny Anderson in the dining room. It goes so well with a piece I got from my parents from the early 1970s. The music room still has a few items left to go- a chair and blue tile on the lower portion of the mantle – but it’s actively being used by Addison and I – and we’ve have enjoyed plucking on the piano and starting lessons. The lounge off the kitchen is so comfortable and cozy. We absolutely love our home. I’m still coming to terms with this new and de-cluttered style, but I really love it and love how much easier it will be to keep up than how we had decorated in the past....

The pain is fading

By on Nov 9, 2014 in Addison's Bedroom, Back Porch, Bonus Room, Cellar, Dining Room, First Floor, Foyer, Guest Bathroom, Guest Bathroom, Guest Bedroom, Kitchen, Living Room, Master Bathroom, Master Bedroom, Master Closet - Hers, Music Room, Office - Hers, Office - His, Pantry, Powder Room, Renovation, Third Floor, Upstairs Landing, Wine Cellar | 13 comments

Benjamin Franklin summed it up perfectly: “There are no gains without pains.” Walking through our home today, I felt the pain leaving me. I’ve joked with many folks about what this renovation has been like. It’s felt like a bad pregnancy – painful and uncomfortable. But now that we see that sweet, beautiful baby – it’s all been worth it. Now our feelings are that of excitement and joy. We’re probably about 95% done. This next week is moving, punch, lots of the last steps of contractors. It’s going to be a zoo. But it will be well worth it. I was able to snap photos of the home today – almost complete with the last coat of poly on the floors. Here is the living room. The dining room towards living room The dining room towards music room and living room Dining Room towards kitchen Music room Kitchen Powder Room Pantry Kitchen...

Drywall – Part 2

By on Aug 15, 2014 in Back Porch, Bonus Room, Cellar, Dining Room, First Floor, Foyer, Guest Bathroom, Kitchen, Laundry Room, Living Room, Lounge, Master Bathroom, Master Bedroom, Office - Hers, Office - His, Pantry, Renovation, Second Floor, Third Floor, Upstairs Landing, Wine Cellar | 2 comments

These guys have been working hard. The drywall is all up and they are starting to skim and sand. Entry (just a cleanup and ceiling replacement) Living room (we just added a new ceiling) Living room Dining room (new ceiling and wall) Dining room. Pantry Kitchen The beams are really going to turn out great. Love when good collaboration happens! Kitchen Doors were stained a walnut finish. Porch walls were started. Halfway down to cellar Wine cellar. Upstairs landing (extended a wall, added recessed lighting, new ceiling) Upstairs hall bath (this is going to be such a great guest bath!) Entry hall into master (new everything!) Master bedroom. Master bath. My office (the house ended in the middle of this room and we removed a fireplace, added a closet and second window) Office. Upstairs laundry (beyond excited about this!!) Stairs to third level Third level bonus room The bench they had to...

Drywall – Part 1

By on Aug 6, 2014 in Back Porch, Bonus Room, Dining Room, First Floor, Foyer, Kitchen, Living Room, Lounge, Master Bathroom, Master Bedroom, Master Closet - Hers, Music Room, Office - Hers, Office - His, Renovation, Second Floor, Third Floor, Upstairs Landing | 2 comments

I think that the last few days have been as transformative as the days when the demo started. On Friday the drywall was delivered. (Glad I was not here to watch it.) Our neighbors have been very, very patient with us. (Thank you Bill and Susan!!) This guy worked HARD on Friday! Then on Saturday the beadboard ceiling went up on the back porch. Some of the ceilings came down on Friday. Here’s the second floor looking into office – Friday. On Monday and Tuesday the crew went to town.  By the end of Tuesday the 3rd floor, part of the second floor and ceilings were added. Below are some pics from the last two days. Here’s the same office on Tuesday afternoon. My closet – Tuesday afternoon. (I’m smiling!) Master bedroom Saturday. Master bedroom Tuesday. Master bathroom Friday. Master bathroom Tuesday. Living room with new ceiling. Upstairs landing with new...